Alderfield Homes
Burlington · Oakville · Milton · Flamborough · West GTA

Webuildsixhousesayear.

Yours is one of them.

The Lowville House · Burlington · 4,200 sq ft · 2025

The paperwork, before you ask for it.

HCRA
Tarion
RenoMark
CHBA
OHBA
HCRA-licensed builder and vendorEvery home enrolled in Tarion$5M liability, WSIB clearance current

Ask us for any of the four and you get it the same day.

Seven phases. The last one starts after you move in.

i
First conversation
What you want, what your land will allow, and what that costs. No charge.
ii
Feasibility
Site, zoning, servicing, permits. We find the problems before you buy them.
iii
Design
Drawings you can actually read, revised until it's right.
iv
Fixed price
One number, itemised. Changes are quoted before the work, never after it.
v
Build
One project manager, on your job from start to finish. Weekly updates.
vi
Handover
Walkthrough, deficiency list, every manual and warranty in one binder.
vii
The first year, and the seven after
We come back at 30 days, at one year, and whenever something moves. Your Tarion coverage runs seven years. So do we.
The full process

Nobody in this industry publishes numbers. Here are ours.

A custom home with us runs between $400 and $650 a square foot, depending on the site, the structure, and how far the finishes go. For most people that puts a 3,500 square foot house somewhere between $1.4 and $2.3 million, plus land.

These are ranges, not quotes. Anyone giving you a firm number before they have seen your site is guessing. But you should be able to tell in thirty seconds whether we are in your range.

Custom homes, per sq ft$400 – $650
Typical 3,500 sq ft build$1.4M – $2.3M
Renovations and additions from$180,000
First conversation to keys16 – 24 months
Of that, before ground breaks4 – 7 months
Homes per yearSix to eight
2009
Building since
96
Homes completed
11
People
6–8
Houses a year
A builder feeding a length of timber through a saw bench in a brick workshop.

Tom still swings a hammer. Badly, now, but he does.

Alderfield started in 2009 with one carpenter and one house. There are eleven of us now and we still cap the year at eight, because the alternative is being the builder nobody can get on the phone.

Meet the team

They’ll tell you themselves.

"We interviewed four builders. Alderfield was the only one who told us what our lot was going to cost us before we'd hired anyone."

The Kilbride House, 2024

"Two change orders in fourteen months. Both quoted before the work happened. I've heard the horror stories. That wasn't ours."

The Bronte Creek House, 2023

"They came back a year later because a door had dropped. I hadn't even called."

The Flamborough House, 2022

Check these. On us, or on anybody.

Confirm the HCRA licence. Confirm Tarion enrolment. Ask for a current WSIB clearance certificate. Get it in writing.

The full checklist

Thirty minutes. Bring your lot, your budget, or just the idea.

We'll tell you what is possible on your site and roughly what it costs. If we are not right for it, we will say so and point you at someone who is.

Book a project call